Ray Hubbard Concrete (469) 434-3908Rowlett & Lake Ray Hubbard

A Rowlett concrete contractor for driveways, patios and slabs — priced by the square foot, built for Blackland clay.

The soil between Rowlett and the lake moves with every wet spring and dry August. Concrete that lasts here is about what happens before and after the pour — the base, the steel, the joints, the cure. That’s the job, and it’s the whole job we quote.

Call (469) 434-3908request a written quote
Broad new driveway curing in front of a just-finished build

Flatwork, start to finish

Driveways, patios and slabs for Rowlett yards

Driveways

New pours, full replacements, widenings and approach work. Most Rowlett driveways land $6–$15 per square foot depending on tear-out and finish.

Driveway details →
Finished two-car driveway, broom texture, clean control joints

Patios & Stamped Finishes

Broom-finish patios, exposed aggregate, and stamped patterns with color — outdoor floors that shrug off North Texas sun.

Patio options →
Random-stone stamped surface after a few seasons of use

Garage & Shop Slabs

Shop floors, garage extensions, carport pads and shed bases — specified by what will actually sit on them, not by the cheapest possible pour.

Slab specs →
Pump line laying mud across a reinforced pad

Wondering about cost?

We wrote the numbers down — what replacement actually costs in Rowlett, line by line, including the tear-out nobody mentions on the phone.

Read the cost guide →
Striking off a wet pour, tanker on the street behind

Straight numbers

What concrete runs around Lake Ray Hubbard

ProjectTypical rangeWhat moves the number
New driveway (per sq ft)$6 – $10Size, thickness, finish
Driveway replacement (per sq ft)$8 – $15Tear-out & haul-off added
Two-car driveway, all-in$2,400 – $8,600Roughly 400–650 sq ft
Patio, broom finish (per sq ft)$6 – $12Access, shape, grading
Stamped & colored (per sq ft)$8 – $30Pattern, color system, sealing
Garage / shop slab (per sq ft)$6 – $12Thickness, reinforcement, plumbing

Planning ranges, not quotes — your written number comes after we measure. It doesn’t move after that.

The soil under Rowlett

Blackland clay moves. The pour has to plan for it.

Rowlett sits on the Blackland Prairie — clay that swells with a wet winter and shrinks hard in a dry August, cycling every single year. Any slab poured on it will be asked to flex. The difference between a driveway that cracks along its control joints (fine, invisible, by design) and one that cracks through the middle of the parking pad (the other kind) is decided before the truck ever shows up: moisture-conditioned subgrade, compacted base, steel placed mid-slab where it works, and joints sawed on time, deep enough, in a pattern that gives the slab somewhere to break on purpose.

Cure matters just as much in a DFW summer — concrete finished at 3pm in July wants to dry out faster than it can gain strength, which is how surface dusting and early cracking happen. We schedule summer pours early and keep them wet-cured. Boring discipline, better slabs. If you want the deeper engineering rabbit hole, the American Concrete Institute publishes more about joints and curing than any homeowner will ever need.

One more local note: driveway approaches touch city right-of-way, and Rowlett reviews that work — check the City of Rowlett site or ask us; permit handling is part of the job when the apron is in scope.

Bull float pass while the mud is still wet off the chute
Flat starts wet — float, cut, cure, in that order, on schedule.

How a job runs

Measure, pour, cure — with a fixed number the whole way

1 · Measure & quote

We walk the site, measure, check drainage and access, and hand you a written square-foot price. Free, no sign-today theater.

2 · Prep & pour

Tear-out if it’s a replacement, forms, base, steel, then the pour — struck off, floated, finished and jointed on schedule.

3 · Cure & hand-off

You get plain guidance on when to walk it (a day or two) and when to park on it (about a week), plus a walk-through when it’s done.

Where we pour

Rowlett first, the lake towns with it

Home base is Rowlett — the President George Bush corridor, the lakeside neighborhoods, the streets that were farmland fifteen years ago. Across the water we pour in Rockwall, up the shore in Wylie, and next door in Sachse. If the drive is under half an hour, the answer to “do y’all come out here?” is yes.

Asked constantly

The questions every driveway call starts with

Will it crack?
All concrete cracks — anyone who promises otherwise is selling something. The honest version: a well-built slab cracks where the saw cuts told it to, inside the joints, where you’ll never notice. Random mid-panel cracking is what bad base prep and late jointing look like, and it’s what the whole job is engineered to prevent.
How long before we can use it?
Walk on it in 24–48 hours, park a car after about 7 days, keep heavy trucks off for closer to 28. In summer heat we’ll give you exact timing for your pour — hot, dry days change the cure schedule, not the price.
Do you do half-driveway repairs?
Sometimes — a broken section can be cut out and re-poured if the base under it is sound, and we’ll tell you plainly when that’s a good buy. When the whole slab is moving, section patches are rented time, and the replacement math usually wins. You get the honest version on-site.

Get your square-foot number this week

Measured on-site, written down, and held. Rowlett, Rockwall, Wylie, Sachse.

Call (469) 434-3908or use the form
Concrete quote? Tap to call (469) 434-3908